Projects

Back to projects

A LEADER IN THE PETROCHEMICAL INDUSTRY

Form of contract | Tender

Overall contract programme | 26 Weeks

 

Elliott beat off stiff competition to win the contract to supply blast resistant, re-rated, toxic refuge shelters in the first phase of the site transport project. This is part of the integration of the new £200 million site, which will convert 1 million tonnes of wheat into Bioethanol and animal feed each year.

The VMA (Vehicle Marshalling Area) Building: (202mba)

The VMA building contains an induction room for drivers, administration area, toilets and kitchen and is designed to be a refuge for up to 40 people for up to an hour in the event of a toxic release.

The G2 (Gatehouse 2) Building: (156mba)

The G2 building contains areas for the control of both inbound and outbound traffic. It has toilet and kitchen facilities and is a refuge for 30 people for up to an hour.

 

Result

These are highly engineered, high pro le, high speci cation buildings which are located at the main entrance and are the rst buildings that all visitors interact with when approaching the site. These portable buildings are bespoke sale items, built to the client’s exacting speci cations

WANT TO KNOW MORE?

You can get more information by downloading our brochure
or by contacting us.

Download BrochureContact us
Other projects «Construction, Infrastructure, Petrochemical, Retail, Utilities»
Construction
,
Infrastructure
,
Petrochemical
,
Retail
,
Utilities
Petrochemical
,
Utilities

GET IN TOUCH

To discuss any of our products or services further, please make an enquiry with our team who can discuss your exact requirements